2,096
edits
m (Reverted edits by FriendofJohnShaxx (talk) to last revision by MorningWalker) |
(Out of date there) |
||
Line 217: | Line 217: | ||
A contract signed with Activision stated that Bungie was to release disc-based sequels to the game every second year up until 2019. The "largest downloadable product" would then be released in 2020. This was based on the projected 2013 release date however.<ref name = "CourtSequel"/> | A contract signed with Activision stated that Bungie was to release disc-based sequels to the game every second year up until 2019. The "largest downloadable product" would then be released in 2020. This was based on the projected 2013 release date however.<ref name = "CourtSequel"/> | ||
==Reception== | ==Reception== |